Syska Hennessy Group has been retained since 1997 as the Prime Contractor
to the U.S. Army Corps of Engineers, providing a broad range of
professional and construction services in support of government
medical facility repair and renewal programs throughout the continental
US and US Territories. Work performed by Syska under this contract
includes site investigation, design, and construction:
Site Investigation
The Site Investigation phase is typically contracted based on
a preliminary scope of work. Existing site conditions are investigated
to determine detailed project requirements, alternate solutions,
and cost estimates for implementation. The deliverable for the
Site Investigation phase is a report of findings, recommendations
for solution, and a firm fixed cost proposal to complete the next
phase of work.
Work Plan
The Work Plan includes sufficient engineering and design documentation
to illustrate the work needed to be performed and to develop a
detailed implementation plan for the Repair/Renewal Phase. The
Work Plan includes design documents, material and equipment submittals,
a detailed implementation schedule and a cost proposal for the
Repair/Renewal Phase.
Repair/Renewal Phase
The Work Plan is executed in this phase and the Task Order is
closed-out. Syska often self-performed most work during the Site
investigation and Work Plan Phases and performs the Repair/Renewal
Phase work as a General Contractor, utilizing local trade subcontractors
whenever possible. Syska Hennessy Construction performs all on-site
supervision, QC and Safety Plan administration.
Syska has successfully completed most of the 100+
task orders performed under this contract. Some of the activities
include:
- Existing Conditions Investigations
- Alternative analysis and engineering solutions
- Engineering concept development
- Budget development and implementation
- Design and contract documentation and coordination
- Major Equipment procurement
- Procurement of all trade subcontracts
- Trade Subcontract work Oversight, management and coordination
- Site specific Quality Control Plans development and implementation
- Site specific Safety Plan development and implementation
- System Operating and Maintenance Manuals
- Site specific Training Plan development and implementation
- Data Bases for Real Property Installed Equipment (RPIE)
- Subcontracting Plan Management
- Warranty response
- Client relationship management, including:Contracting Office,
Facilities Managers, End Users, Base Civil Engineers/Department
of Public Works, representatives of local Corps of Engineers Districts,
Base Commanders, etc.
Results of Our Work
With over 100 task orders issued through this Medical Remediation
and Medical Repair/Renewal Program, Syska has yet to request a modification
or equitable adjustment other than for an increase in scope.
|
 |